After removing damaged insulation, 19,000 s.f. of the HIGH-R Banded Insulation Solution was installed in the airplane hanger. Following the install of the banded system, 8″ of blow-in fiberglass insulation was blown above the scrim to add r-value. Through the utilization of 2 – 32 ft. scissor lifts, the project was completed in a period of 3 weeks